Caltrans
Focus area activities: Long lasting pavements
|
Focus Area |
Description |
Objectives |
Results |
|
Long lasting pavements |
|
|
|
Reports for Focus area: Long lasting
pavements
|
Title |
Report / Tech Memo No. |
Authors |
Date of issue |
|
Reports |
|
|
|
|
Economic Implications of
Selection of Long-Life versus Conventional Caltrans Rehabilitation Strategies
for High-Volume Highways |
Not Assigned |
Jones, D., C. Lee, and J.
Harvey |
Jun-05 |
|
Characterization of
Effective Built-in Curling and Concrete Pavement Cracking on the Palmdale
Test Sections |
Not Assigned |
Rao, S., and J. Roesler |
May-05 |
|
Accelerated Laboratory
Testing for Alkali-Silica Reaction Using ASTM 1293 and Comparison with ASTM
1260 |
Not Assigned |
Carlos, C. Jr., M. Mancio, K. Shomglin, J. T.
Harvey, P. Monteiro, and A. Ali |
Nov-04 |
|
Palmdale South Tangent Built-In
Curling and Cracking: Preliminary Analysis Report |
Not Assigned |
Rao, S. and J. Roesler |
May-04 |
|
Analysis and Estimation of
Effective Built-In Temperature Difference for North Tangent Slabs: Data
Analysis from the Palmdale, |
Not Assigned |
Rao, S. and J. Roesler |
May-04 |
|
Goal 4 Long Life Pavement
Rehabilitation Strategies--Rigid: Laboratory Strength, Shrinkage, and Thermal
Expansion of Hydraulic Cement Concrete Mixes |
Not Assigned |
Zhang, J., J.T. Harvey, A. Ali,
and J. Roesler |
Feb-04 |
|
Environmental Influences on
the Curling of Concrete Slabs at the Palmdale HVS Test Site |
Not Assigned |
Plessis, L and J. Harvey |
Jun-03 |
|
HVS Test Results on
Fast-Setting Hydraulic Cement Concrete, |
Not Assigned |
du Plessis, L., D. Bush, F. Jooste, D. Hung, C. Scheffy, J.
Roesler, L Popescu, J. T.
Harvey |
Jul-02 |
|
Accelerated Laboratory
Testing for High Early Strength Concrete for Alkali Aggregate Reaction |
Not Assigned |
Shomglin, K., Monteiro, P., and
Harvey, J. |
Jul-01 |
|
Case Study of Urban
Concrete Pavement Reconstruction and Traffic Management for the I-10 ( |
Not Assigned |
Lee, E. B., J. R. Roesler, J. T. Harvey, and C. W. Ibbs. |
Jan-01 |
|
CAL/APT Program Summary
Report Six Year Period: 1994-2000 |
FHWA/CA/RM-2000/15 |
Harvey, J. T., J. Roesler, N. F. Coetzee, and C.
L. Monismith |
Jun-00 |
|
Preliminary Evaluation of
Proposed LLPRS Rigid Pavement Structures and Design Inputs |
FHWA/CA/OR-2000/02 |
Harvey, J. T., J. Roesler, J. Farver, and L. Liang |
May-00 |
|
Accelerated Test for Measuring
Sulfate Resistance of Hydraulic Cements for Caltrans LLPRS Program |
Not Assigned |
P. Monteiro,
J. Roesler, K.E. Kurtis
and J.T. Harvey |
Apr-00 |
|
Assessing the Economic
Benefits from the Implementation of New Pavement Construction Methods |
Not Assigned |
Gillen, D., J. T. Harvey,
D. Cooper, and D. Hung |
Mar-00 |
|
Investigation of Design and
Construction Issues for Long Life Concrete Pavement Strategies |
FHWA/CA/OR-2000/02 |
Roesler, J. R., J. T. Harvey, J. Farver,
and F. Long |
Feb-00 |
|
Constructability Analysis
for Long Life Concrete Pavement Rehabilitation Strategies |
FHWA/CA/OR-2000/01 |
Lee, E., W. Ibbs, J. Harvey, and J. Roesler |
Feb-00 |
|
Shrinkage and Thermal
Cracking of Fast Setting Hydraulic Cement Concrete Pavements in |
Not Assigned |
Heath, A. C. and J. R. Roesler |
Dec-99 |
|
CAL/APT Goal LLPRS - Rigid
Phase III: Concrete Test Section 516CT Report |
Not Assigned |
Roesler, J., L. du Plessis, D. Hung, D. Bush, J. Harvey |
Apr-99 |
|
Analysis of Durability of Advanced
Cementitious Materials in Rigid Pavement
Construction in |
Not Assigned |
K.E. Kurtis
and P. Monteiro |
Apr-99 |
|
Technical Memos |
|
|
|
|
Evaluation of I-15 Devore
(08-0A4224) Long-Life Pavement Rehabilitation Costs |
TM-UCB-PRC-2005-8 |
Fermo, M.G., N. Santero, W. Nokes, and J. Harvey |
Jun-05 |
|
Evaluation of I-710 |
TM-UCB-PRC-2005-6 |
Harvey, J, N. Santero, H. Lee, W. du Toit, M.
G. Fermo |
Jun-05 |
|
Evaluation of I-10 |
TM-UCB-PRC-2005-5 |
Harvey, J, N. Santero, M. G. Fermo |
Jun-05 |
|
Evaluation of I-80
Long-Life Corridor Costs |
TM-UCB-PRC-2005-4 |
Santero, N., W. Nokes, and J.
Harvey |
Jun-05 |
|
Fast-Track Urban Freeway
Rehabilitation with 55-hour Weekend Closures: I-710 Long Beach Case Study |
TM-UCB-PRC-2004-4 |
Lee, E. B., H. Lee, and J.
T. Harvey |
Mar-04 |