Caltrans
Focus area activities: Asphalt
|
Focus Area |
Description |
Objectives |
Results |
|
Asphalt |
|
|
|
Reports for Focus area: Asphalt
|
Title |
Report / Tech Memo No. |
Authors |
Date of issue |
|
Reports |
|
|
|
|
Performance of Drained and
Undrained Flexible Pavement Structures under Wet Conditions -- Accelerated
Test Data, Test Section 545, Undrained |
Not Assigned |
Bejarano, M.O., J.T. Harvey, A. Ali, D. Mahama,
D. Hung, P Preedonant |
Dec-04 |
|
Analysis of 30 Years of
Pavement Temperatures using the Enhanced Integrated Climate Model (EICM) |
Not Assigned |
Ongel, A. and J. T. Harvey |
Aug-04 |
|
Performance of Drained and
Undrained Flexible Pavement Structures under Wet Conditions Test Data from
Accelerated Pavement Test Section 544-Undrained |
Not Assigned |
Bejarano, M. O., J. T. Harvey, A. Ali, D. Mahama, D. Hung, and P. Preedonant |
May-04 |
|
Guidelines for pavement
deflection Testing and analyses |
Not Assigned |
Partnered |
May-04 |
|
Performance of Drained and Undrained
Flexible Pavement Structures under Wet Conditions Test Data from Accelerated
Pavement Test Section 543-Drained |
Not Assigned |
Bejarano, M. O., J. T. Harvey, A. Ali, M. Russo, D. Mahama, D. Hung, and P. Preedonant |
Feb-04 |
|
Performance of Drained and
Undrained Flexible Pavement Structures in Accelerated Loading under Wet
Conditions, Summary Report – Goal 5, Partnered Pavement Performance
Program |
Not Assigned |
Bejarano, M., Harvey, J., Ali, A., Mahama,
D., Hung, D. and P. Preedonant |
Mar-03 |
|
High Temperature Fatigue
and Fatigue Damage Process of Aggregate-Asphalt Mixes |
Not Assigned |
Tsai, B. |
Feb-03 |
|
The Design and
Implementation of the |
Not Assigned |
Lea, J. and L. Popescu |
Feb-03 |
|
Data Mining of the Caltrans
Pavement Management System (PMS) Database |
Not Assigned |
Lea, J. and J. T. Harvey |
Aug-02 |
|
Stiffness, Strength, and
Performance of Unbound Aggregate Material: Application of South African HVS
and Laboratory Results to |
Not Assigned |
Theyse, H. L |
Jul-02 |
|
Truck Traffic Analysis
using Weigh-In-Motion (WIM) Data in |
Not Assigned |
Lu, Q., J. Harvey, J. Lea,
R. Quinley, D. Redo, J. Avis |
Jun-02 |
|
Constructability and Productivity
Analysis for Long Life Asphalt Concrete Pavement Rehabilitation Strategies |
Not Assigned |
Lee, E. B., C. W. Ibbs, J. T. Harvey, J. R. Roesler |
Jun-01 |
|
Performance of Caltrans
Asphalt Concrete and Asphalt-Rubber Hot Mix Overlays at Moderate Temperatures
-- Accelerated Pavement Testing Evaluation |
Not Assigned |
Harvey, J. T., M. Bejarano, A. Fantoni, A. Heath,
H. C. Shin |
Dec-00 |
|
CAL/APT Program Summary
Report Six Year Period: 1994-2000 |
FHWA/CA/RM-2000/15 |
Harvey, J. T., J. Roesler, N. F. Coetzee, and C.
L. Monismith |
Jun-00 |
|
Climate Regions for
Mechanistic-Empirical Pavement Design in |
Not Assigned |
Harvey, J. T., A. Chong, and J. Roesler |
Jun-00 |
|
Assessing the Economic Benefits
from the Implementation of New Pavement Construction Methods |
Not Assigned |
Gillen, D., J. T. Harvey,
D. Cooper, and D. Hung |
Mar-00 |
|
Rutting of Caltrans Asphalt
Concrete and Asphalt-Rubber Hot Mix Under Different Wheels, Tires, and
Temperatures - Accelerated Pavement Testing Evaluation |
Not Assigned |
Harvey, J. T. and L. Popescu |
Jan-00 |
|
CAL/APT Program -
Construction of the Goal 3 Overlays and Recommendations for Improved Overlay
Performance in |
Not Assigned |
Harvey, J. T., N. Coetzee, and L. Louw |
Nov-99 |
|
Asphalt Treated Permeable
Base (ATPB), Laboratory Tests, Performance Predictions and Evaluation of
Caltrans and Other Agencies Experience |
Not Assigned |
Harvey, J., B-W Tsai, F.
Long, and D. Hung |
Jun-99 |
|
CAL/APT Program: Test
Results from Accelerated Pavement Test on Pavement Structure Containing
Untreated Aggregate Base - Section 501RF |
Not Assigned |
Harvey, J., J. Prozzi, J. Deacon, D. Hung, I. Guada,
L. du Plessis, F. Long,
and C. Scheffy |
Apr-99 |
|
Effects of Material
Properties, Specimen Geometry, and Specimen Preparation Variables on Asphalt
Concrete Tests for Rutting |
Not Assigned |
Harvey, J., |
Mar-99 |
|
CAL/APT Program: Test Results
from Accelerated Pavement Test on Pavement Structure Containing Asphalt
Treated Permeable Base - Section 502CT |
Not Assigned |
Harvey, J. T., |
Nov-98 |
|
CAL/APT Program: Test Results
from Accelerated Pavement Test on Pavement Structure Containing Untreated
Aggregated Base - Section 503RF |
Not Assigned |
Harvey, J. T., D. Hung, J. Prozzi, L. Louw, C. Scheffy, and |
Jan-98 |
|
CAL/APT Program -
Comparison of Caltrans and AASHTO Pavement Design Methods |
Not Assigned |
Harvey, J. T. and F. Long |
Nov-97 |
|
Permanent Deformation First
Level Data Analysis of Test Results from Accelerated Pavement Test on Pavement
Structure Containing Dense Graded Asphalt Concrete (DGAC) Section 504RF |
Not Assigned |
Harvey, J. T., and L. Louw |
Jul-97 |
|
CAL/APT Program: Test
Results from Accelerated Pavement Test on Pavement Structure Containing
Asphalt Treated Permeable Base (ATPB) Section 500RF |
RTA-65W485-3 |
Harvey, John T., Louw du Plessis,
Fenella Long, John A. Deacon, Irwin Guada, David Hung, Clark Scheffy |
Jun-97 |
|
Contact Stresses of
Pneumatic Tires Measured with the Vehicle-Road Surface Pressure Transducer Array
(VRSPTA) System for UCB and the |
Not Assigned |
de Beer, M., and C. Fisher |
Jan-97 |
|
Initial CAL/APT Program:
Site Information, Test Pavement Construction, Pavement Materials
Characterizations, Initial CAL/HVS Test Results, and Performance Estimates |
RTA-65W485-3 |
Harvey, J. T, L. du Plessis, F. Long, S. Shatnawi, C. Scheffy, B. Tsai,
I. Guada, D. Hung, N. Coetzee,
M. Reimer, and C. L. Monismith |
Jun-96 |
|
Fatigue Performance of Asphalt
Concrete Mixes and Its Relationship to Asphalt Concrete Pavement Performance
In |
RTA-65W485-2 |
Harvey, J., J. Deacon, B.
Tsai, and C. Monismith |
Jan-96 |
|
Technical Memos |
|
|
|
|
Evaluation of New Patching Material
for Open-Graded Asphalt Concrete (OGAC) Wearing Courses |
TM-UCB-PRC-2005-9 |
Frick, K |
Jun-05 |
|
Evaluation of I-15 Devore
(08-0A4224) Long-Life Pavement Rehabilitation Costs |
TM-UCB-PRC-2005-8 |
Fermo, M.G., N. Santero, W. Nokes, and J. Harvey |
Jun-05 |
|
Report of Field Site Visit
District 3, |
TM-UCB-PRC-2005-7 |
Ongel, A., N. Santero, J.
Harvey |
Jun-05 |
|
Evaluation of I-710 |
TM-UCB-PRC-2005-6 |
Harvey, J, N. Santero, H. Lee, W. du Toit, M.
G. Fermo |
Jun-05 |
|
Evaluation of I-80
Long-Life Corridor Costs |
TM-UCB-PRC-2005-4 |
Santero, N., W. Nokes, and J.
Harvey |
Jun-05 |
|
Report of Trip to SR-86,
District 11, Near |
TM-UCB-PRC-2005-1 |
Lee, C |
Feb-05 |
|
Fast-Track Urban Freeway
Rehabilitation with 55-hour Weekend Closures: I-710 Long Beach Case Study |
TM-UCB-PRC-2004-4 |
Lee, E. B., H. Lee, and J.
T. Harvey |
Mar-04 |
|
Impact of Urban Freeway
Rehabilitation on Network Traffic: Measurement and Simulation Study |
TM-UCB-PRC-2004-1 |
Lee, E. B., J. H. Lee, and
J. T. Harvey |
Feb-04 |
|
State Route 138 -Test Site Evaluation
Update of Evaluation Activities in March and October 2002 |
TM-UCB-PRC-2003-1 |
Bush, D., J. Harvey, R. Hagedorn, D. Kim |
Apr-03 |
|
State Route 138--Test Site
Evaluation |
TM-UCB-PRC-2001-2 |
Bush, D., J. Harvey |
Jun-01 |
|
Pay Factors for
Asphalt-Concrete Construction: Effect of Construction Quality on Agency Costs |
TM-UCB-PRC-2001-1 |
Deacon, J. A., C. L. Monismith, J. T. Harvey, and L. Popescu |
Feb-01 |
|
Tests to Evaluate the
Stiffness and Permanent Deformation Characteristics of
Asphalt/Binder-Aggregate Mixes - A Critical Discussion |
TM-UCB-PRC-2000-1 |
Monismith, C. L., J. T. Harvey, F. Long, S. Weissman |
Jun-00 |
|
Overlay Design for Cracked
and Seated Portland Cement Concrete(PCC) Pavement -- |
TM-UCB PRC 99-3 |
Monismith, C. L., and F. Long |
Sep-99 |
|
Pavement Survey Technical
Memorandum |
TM UCB-CAL/APT-99-1 |
Harvey, J. T. and A. Chong |
Feb-99 |
|
Mix Design and Analysis and
Structural Section Design for Full Depth Pavement for |
TM-UCB PRC 99-2 |
Monismith, C. L., and F. Long |
Jun-99 |
|
Pay Factors for
Asphalt-Concrete Construction: Effect of Construction Quality on Aging Costs |
TM-UCB-CAL/APT-97-1 |
Deacon, J. A., C. L. Monismith, and J. T. Harvey |
Apr-97 |